New Way Projects has made an enthusiastic start on building the pavilion in Bant. The craftsmen of Drents Eiken Gebint stood out for their precision and skilled approach. An impressive start, in which the trusses were first carefully adapted from 20 metres to 16 metres and from 15 to 21 degrees. A fine piece of precision work, followed by the impressive lifting of the trusses using two cranes.
These adaptations are just a foretaste of the craftsmanship and dedication we put into every project. We look forward to bringing this pavilion to life and creating a unique structure.
The next step is installing the steel and aluminium, after which we can make the building fully wind- and watertight with laminated and insulated glass.
The architect behind this project is KHV Architecten.
Photos: Ronald Auee















